DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
The developer is adding 59 new homes to four existing residential blocks (A, B, C, D) in Cherrywood by increasing building heights by 1–2 storeys. This amends a previously approved scheme.
The 59 new units comprise 3 studios, 19 one-bed and 37 two-bed homes. Combined with existing permitted units, the development totals 158 homes across four blocks, ranging from 4–5 storeys in height. Minor changes are also being made to 99 existing approved units.
Car parking reduces from 155 to 133 spaces (mostly underground). Bicycle parking increases significantly from 175 to 267 spaces, including 220 long-stay, 45 short-stay and 2 cargo spaces.
A tenant amenity space and temporary crèche facility are being removed. Communal open space is being increased through redesigned courtyards, which now include shared refuse storage.
The basement car park design has been reconfigured. Surface water drainage and sustainable drainage systems (SuDS) are being adjusted. Landscaping and planting schemes are being updated.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.