DZ24A/1024/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
In the Townlands of Laughanstown and Cherrywood, in Cherrywood,, Dublin 18
This is an amendment to an already-approved development (Blocks B1–B3). The proposal reduces car parking and adds more bicycle storage, plus new utility buildings. All residential units remain unchanged.
Car parking is reduced from 312 spaces to 213 spaces (78 at ground level, 135 underground). Bicycle parking increases to 391 spaces total: 82 short-stay and 309 long-stay. A new long-stay bicycle store (39 sq.m) is added to the courtyard.
A new 60 sq.m combined substation, switch room, and refuse store building is added. The underground car park level (podium) beneath Blocks B1–B3 is reduced and reconfigured. Bulky storage replaces some permitted co-working space.
Water drainage tanks along Civic Park are modified, and the surface water management system is updated to match the new layout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.