DZ24A/0585/WEB
RefusedLands within the Townland of Brennanstown, Brennanstown, Dublin 18
Lands within the Townland of Brennanstown, Brennanstown, Dublin 18
The developer is tweaking the already-approved Druid's Glen phase to fit 4 extra homes by rearranging house types, adding terraced houses, and reconfiguring a 3-storey apartment block.
The scheme adds 3 new 2-storey terraced homes (3-bed), replaces older detached and semi-detached homes with 6 new 4-bed terraced homes (net gain of 1), and reconfigures Block A to provide 8 three-bed apartments instead of the original mix. Total homes rise from 342 to 346 units.
Car parking is reduced from 16 to 14 spaces. Cycle and bin storage are being reorganised alongside these changes.
Landscaping and site development works are included. The development sits within the Cherrywood Strategic Development Zone, bounded by Brennanstown Square, Lehaunstown Lane, and local streams.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.