DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
This is an amendment to an existing residential scheme in Cherrywood. The developer is adding one extra storey to two of the buildings, creating 25 new homes and increasing the total scheme from 492 to 517 units.
The 25 new units comprise 10 one-bedroom, 13 two-bedroom, and 2 three-bedroom apartments. The scheme also involves design changes to 54 existing permitted units, including corner balcony redesigns and some unit reconfigurations.
Car parking is being reduced from 555 to 381 spaces (268 below ground, 113 at surface level). Bicycle parking is increasing from 655 to 760 spaces, with improved basement access and new level entry routes.
The site covers 3.73 hectares in Development Area 1 (Lehaunstown) of the Cherrywood Strategic Development Zone. The amendment adds one storey to existing buildings within the previously approved scheme.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.