DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The development reconfigures two residential blocks (C1 and C2) to add 47 new apartments to the existing Cherrywood town centre. The reconfiguration includes new basement and ground-floor layouts, expanded retail and resident facilities, and updated landscaping.
The 431 units comprise 59 studios, 109 one-beds, 231 two-beds, and 32 three-beds. All units have balconies or terraces. The two blocks front onto Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Retail space increases to 564 sq.m. Non-retail space (likely restaurants or services) reaches 2,047 sq.m. Resident amenity areas expand to 1,096 sq.m. A relocated crèche with an outdoor play area is also included.
431 car parking spaces and 431 bicycle spaces are provided, along with 21 motorbike spaces. Parking is reconfigured in basement levels without exceeding the previously permitted total.
Revised landscaping and a green wall are proposed. Utility substations are relocated and one additional substation is added to support the development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.