DZ18A/0458
Grantedon lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully)
on lands (c.0.74 HA) in the townland of Laughanstown, Dublin 18 (Development Area 8 - Tully)
A 2–3 storey primary school building with 24 classrooms, a special needs unit, general purpose hall, library, and support facilities on a 0.74 hectare site in Development Area 8 (Tully).
The school will include a special needs unit with 2 additional classrooms, a general purpose hall for whole-school events, and library and resource facilities. External play areas are provided for children's recreation.
Access is via Castle Street through a new local road currently under construction. The development provides 20 car parking spaces and 192 bicycle spaces to encourage cycling. A dedicated bus set-down area supports school transport.
Landscaping and boundary treatments will integrate the school into the surrounding Cherrywood development. The design and site layout comply with the Cherrywood Planning Scheme 2014.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.