DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The temporary surface car park on the Red Zone will be reduced and reconfigured. Up to 398 spaces will continue for another 5 years, along with bus drop-off and motorcycle parking. Additionally, 226 existing basement car spaces in Blocks F1–F3 of The Campus will be reallocated as temporary parking for the wider development.
The existing temporary surface car park (currently around 740 spaces) will be shrunk and rearranged to match new residential development on the adjacent plot. Water drainage and access routes will be redesigned accordingly. Bus set-down and motorcycle parking areas will be retained on site.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.