DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
This is an amendment to an already-approved development in Lehaunstown, Cherrywood. The scheme adds one storey to two buildings, creating 25 new homes and making changes to parking, cycling facilities, and public spaces.
The development will contain 517 residential units in total (increased from 492). The new 25 units comprise 10 one-bed apartments, 13 two-bed apartments, and 2 three-bed apartments. Additionally, 54 existing permitted units are being altered, including corner balcony design changes and some reconfiguration of unit types.
Car parking is being reduced from 555 to 381 spaces (268 underground and 113 at surface level). Bicycle parking is increasing significantly from 655 to 760 spaces, with 650 long-stay spaces and 110 short-stay spaces. New level access and stairs with guides are being added to the basement cycle parking area.
The development includes minor adjustments to underground water storage (attenuation facility) and a revised ventilation strategy. Public realm improvements include reconfigured landscaping, streetscapes, and public lighting in open spaces and amenity areas.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.