DZ24A/1016/WEB
RefusedIn the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, in Cherrywood, Dublin 18
This is an amendment to an already-approved residential scheme in Cherrywood. The developer is removing the basement car park level and redesigning the lower ground floor, which reduces car parking and increases bicycle parking. The number of homes remains exactly the same.
Car parking is being cut from 241 spaces to 160 spaces, all located at lower ground floor level. Bicycle parking is increasing slightly from 270 to 272 spaces. These changes reflect a shift toward less car dependency and more active travel.
The site sits within Cherrywood's Macnebury area (Development Area 7), bounded by Bishop Street to the north, Cherrywood Avenue to the east, the M50 to the west, and the Wyattvile Link Road to the south. No change to the overall building footprint or height.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.