DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The development reconfigures three existing apartment blocks (C1, C2 and D1) in Cherrywood town centre to add 47 new homes, increasing the total from 384 to 431 units.
The 431 homes comprise 59 studios, 109 one-bedroom, 231 two-bedroom, and 32 three-bedroom units. All units have balconies or terraces. The residential floor area increases from 35,290 sq.m to 35,787 sq.m across the three blocks fronting Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road.
Retail space increases to 564 sq.m. Non-retail space (offices, services) rises to 2,047 sq.m. Resident amenity areas grow to 1,096 sq.m. A relocated crèche with outdoor play area is included, with a modest 9 sq.m increase from the original permission.
431 car parking spaces are reconfigured across two basement levels without exceeding the original permit limit. 431 bicycle spaces and 21 motorbike spaces are provided, plus secure storage for residents.
Landscaping is revised throughout the development, with a new green wall added. Plant and substations are relocated at roof and basement levels to optimise space.