DZ23A/0811
RefusedIn the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood. Macnebury, Development Area 7 , Cherrywood, Dublin 18
A new residential development of 200 apartments across 3 blocks ranging from 4–5 storeys high on a site bounded by Bishop Street, Cherrywood Avenue, the M50, and the Wyattvile Link Road.
Block A1 has 68 units (12 one-bed, 41 two-bed, 15 three-bed). Block A2 has 54 units (14 one-bed, 39 two-bed, 1 three-bed). Block A3 has 78 units (14 one-bed, 49 two-bed, 15 three-bed). All apartments are owner-occupier units.
The development provides 241 car parking spaces (139 at lower ground, 102 in basement), with 10 accessible spaces and 48 for electric vehicles. 264 bicycle spaces are provided (220 long-stay, 44 short-stay) plus 10 motorcycle spaces. Vehicle access is via Cherrywood Avenue.
The site includes 1,645 sq.m of courtyard gardens, of which 1,456 sq.m is private communal space. Hard and soft landscaping, including public lighting and boundary treatments, will be provided. Minor revisions to the adjacent Phase 1 development include landscaping amendments to the civic park and relocation of infrastructure.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.