DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The temporary car park at the Red Zone is being reduced from 740 spaces to 398 spaces, with the layout reconfigured to match neighbouring residential development. Additionally, 226 existing basement car spaces in Blocks F1-F3 will be made available as temporary parking for the wider Cherrywood scheme.
The reconfigured temporary surface car park will include bus set-down and motorcycle parking areas. The temporary car parking permission is being extended for a further 5 years. Surface water drainage and access arrangements are being updated to align with the adjacent residential development.
The development affects Plot HIE3 (the temporary Red Zone car park) and the basement level of Blocks F1-F3 at The Campus, Cherrywood Avenue.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.