DZ24A/0585/WEB
RefusedLands within the Townland of Brennanstown, Brennanstown, Dublin 18
Lands within the Townland of Brennanstown, Brennanstown, Dublin 18
Changes to the first phase of Druid's Glen in Cherrywood: 3 new 2-storey terraced houses, replacement of older units with 6 new 4-bed terraced homes, and reconfiguration of a 3-storey duplex block to create 8 three-bedroom apartments instead of mixed sizes.
The original permission allowed 342 units; these amendments add 4 more homes, bringing the total to 346 units. Mix includes terraced houses (2 and 3-storey), semi-detached homes, detached houses, and duplex apartments. All changes are within Phase 01, north of the Druid's Glen Distributor Road, which is now open to the public.
Parking spaces reduced from 16 to 14 surface spaces due to site reconfiguration. Cycle and bin storage facilities included in the development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.