DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
An amendment to an existing residential scheme to add 59 new homes across four blocks, along with changes to parking, cycling facilities, and open space.
The development adds 59 units: 3 studios, 19 one-bed and 37 two-bed apartments. Four blocks will increase in height by 1–2 storeys, reaching 4–5 storeys. A small number of the existing 99 permitted units are being reconfigured.
Car parking reduces from 155 to 133 spaces (mostly basement-level). Bicycle parking nearly doubles to 267 spaces (220 long-stay, 45 short-stay and 2 cargo spaces), supporting car-free living.
The site's water drainage and sustainable drainage systems (SuDS) are being redesigned to match the new basement layout. Open space is being increased, with improvements to courtyards and landscaping.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.