DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
This is an amendment to a previously approved development adding 59 new homes and increasing cycle parking across four apartment blocks in Cherrywood.
The 59 new units comprise 3 studios, 19 one-bed and 37 two-bed apartments. Four existing blocks (Block A to D) are being raised by 1–2 storeys, now ranging from 4 to 5 storeys high. An additional 99 permitted units are being slightly modified in layout and design.
Car parking reduces from 155 to 133 spaces (mostly basement). Bicycle parking increases significantly from 175 to 267 spaces, including long-stay, short-stay and cargo spaces.
Landscaping is being redesigned with new courtyard pavilions and increased green space. Surface water drainage and sustainable urban drainage (SuDS) design are being revised to match the reconfigured basement layout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.