DZ21A/1038
Grantedsite 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
site 1.85 ha at Castle Street and Bishop Street, Cherrywood, Dublin 18
A new post-primary school for 1,000 pupils across a 1.85 hectare site, with a dedicated special needs unit, sports hall, and six outdoor ball courts.
The school building is part 3 storeys, part 2 storeys. It includes a PE hall, 4-classroom special educational needs unit, staff facilities, and pupil amenities. 181 sq.m of solar panels will be installed on the roof.
Six external ball courts will serve the school. Landscaping and boundary treatments are planned throughout the site to integrate the development with the surrounding area.
Vehicular access will be from Castle Street, with staff car parking, delivery areas, and emergency vehicle access. Pedestrian and bicycle access routes are included, along with dedicated bicycle parking.
The development includes connections to public services, an ESB sub-station, and associated underground site works. Landscaping is designed to support the school's integration into Cherrywood.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.