DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The developer is reconfiguring three residential blocks (C1, C2, and D1) in the Cherrywood town centre to fit 47 additional apartments, bringing the total from 384 to 431 units.
The 431 apartments comprise 59 studios, 109 one-beds, 231 two-beds, and 32 three-beds. All units will have balconies or terraces. The blocks front onto Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Retail space increases from 299 sq.m to 564 sq.m. Non-retail space (offices, services) grows from 1,997 sq.m to 2,047 sq.m. Resident amenity areas expand from 878 sq.m to 1,096 sq.m. A crèche with outdoor play space is relocated and enlarged.
431 car parking spaces (within the permitted total), 431 bicycle spaces, and 21 motorbike spaces will be provided in basements and ground-floor areas.
Landscaping is revised with new green wall provision and associated site works throughout the development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.