DZ17A/0161
GrantedLands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
Lands (site area c.0.95ha) in the townland of Laughanstown, Dublin 18
A temporary concrete batching facility will be built on site to produce concrete and aggregate materials needed for the wider Cherrywood development. The plant will operate for 7 years and will then be removed.
The site will include a batching and mixer plant, cement silos, conveyors, aggregate storage bins, water tanks, fuel storage, an office and welfare facilities for staff, parking for trucks and contractors, and open and covered storage areas. An electricity substation and backup generator will also be installed.
The development will include boundary treatments, site lighting, a pump house, and all associated works to manage the temporary plant safely and securely.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.