DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
This application amends a previously approved residential scheme by adding 59 new homes across four blocks, making them taller. The development sits within the Cherrywood Planning Scheme Area on a 2.73-hectare site bounded by the Luas green line, Tully Vale Road, and Bishop's Street.
The development will contain 158 units total: 3 studios, 20 one-bed units, and 135 two-bed units. Four residential blocks now range from 4 to 5 storeys. All units are described as amendments to the existing permission, with minor layout and façade changes.
133 car parking spaces are proposed (4 at surface level, 129 basement). Bicycle parking increases to 267 spaces (220 long-stay, 45 short-stay, 2 cargo), a significant rise from the original 175. The scheme includes minor road and basement access amendments.
Landscaping is redesigned to increase communal open space and add green courtyard pavilions. Surface water drainage and sustainable urban drainage systems (SuDS) are reconfigured. Planting and boundary treatments are altered to suit the revised layout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.