DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The developer is modifying two apartment blocks (C1 and C2) within the permitted Cherrywood town centre to fit 47 additional homes, bringing total capacity from 384 to 431 units.
The 431 units comprise 59 studios, 109 one-bedroom, 231 two-bedroom, and 32 three-bedroom apartments. All units will have balconies or terraces. The development is part of the mixed-use Cherrywood town centre fronting Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
Retail space increases to 564 sq.m. Non-retail space (cafés, restaurants, services) rises to 2,047 sq.m. A crèche with outdoor play area is relocated within the development. Residents will have 1,096 sq.m of shared amenity space.
431 car parking spaces are provided in basement levels, along with 431 bicycle spaces, 21 motorbike spaces, and storage for residents.
The development includes revised landscaping and a green wall. Utility substations are relocated to accommodate the additional homes and shared facilities.