DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite will be built in the Cherrywood Village Centre to showcase the wider development. The suite will operate for 4 years and 11 months and will then be removed.
3 buildings — two single-storey and one two-storey — will be arranged around a landscaped courtyard enclosed by the buildings and a covered walkway (up to 3.7m high). Total floor area is 304.4 sq.m.
A new vehicular access from Gun and Drum Hill Road will serve 8 car parking spaces. The development will use existing roads (Gun and Drum Hill Road, Castle Street, Bishop Street, and Cherrywood Avenue) to connect to Valley Drive and the Wyatville Link Road.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.