DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The Red Zone temporary car park is being reduced from 740 spaces to 398 spaces, with the freed-up land used for permitted residential development. An additional 226 basement parking spaces in Blocks F1–F3 will be made available for temporary use while the development is ongoing.
The reconfigured temporary car park will include bus set-down and motorcycle parking areas alongside the 398 car spaces. The development is contingent on new residential permissions and rearranged access arrangements on the Red Zone site. The temporary arrangements are approved for a further 5 years.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.