DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
This is an amendment to an existing residential scheme in Cherrywood. The developer is adding one extra storey to two buildings to create 25 additional homes, bringing the total scheme from 492 to 517 units. The development also includes design changes to existing units and improvements to cycle parking and access routes.
The 25 new units comprise 10 one-bedroom, 13 two-bedroom and 2 three-bedroom homes. The wider scheme includes alterations to 54 permitted units, with corner balcony design changes, some units converted to single-aspect, and two units changed from 2-bed to 1-bed. The development spans two buildings with the added storey.
Car parking reduces from 555 to 381 spaces (268 underground, 113 at surface level). Bicycle parking increases significantly from 655 to 760 spaces (650 long-stay, 110 short-stay). New level access and stairs with guide rails improve basement cycle parking access from the northern side.
The development includes reconfigured external public realm and amenity spaces, public lighting, and amenity open spaces throughout the site.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.