An amendment to previously approved plans for plot TC2, adding 47 new homes to three residential blocks (C1, C2, and D1) in Cherrywood town centre, along with expanded retail, community, and parking facilities.
The development will contain 431 apartments across three blocks: 59 studios, 109 one-bedroom, 231 two-bedroom, and 32 three-bedroom units. All units include balconies or terraces. A revised crèche with expanded outdoor play space is included.
The ground floor and basement provide 564 sq.m of retail space and 2,047 sq.m of non-retail uses, alongside 1,096 sq.m of resident amenities including gyms, lounges, and co-working areas.
A crèche with an outdoor play area serves residents. Expanded resident amenity spaces support community activities.
431 car parking spaces are arranged across two basement levels, with 431 bicycle spaces and 21 motorbike spaces provided. The development fronts onto four roads: Grand Parade, Bishop Street, Tully Vale Road, and Wyattville Link Road.
The scheme includes revised landscaping, new green wall features, and relocated utility substations to optimise the site layout.