DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The development includes a new detention basin (a pond that temporarily holds rainwater during heavy downpours) and associated drainage pipes to manage stormwater from the Cherrywood area and direct it safely to Ticknick stream. An existing temporary pond north of Mercer Link Road will be filled in, and the site will be regraded to prepare it for a future school.
The detention basin is a flood-management system designed to reduce flooding risk by temporarily storing and slowly releasing rainwater. Landscaping and seating areas will be added around the pond. The system connects existing drainage from Beckett Park to the natural watercourse.