DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The developer is building a new detention basin (a pond that temporarily holds stormwater) and connecting it to Ticknick stream. This is part of preparing the site for a future school.
The new pond will manage rainwater runoff from the development and reduce flood risk by storing water temporarily before releasing it to the stream. An existing temporary pond to the north will be filled in. The site will be regraded and landscaped with seating areas and boundary treatments.
The site covers 0.95 hectares across two development areas in Cherrywood. This is infrastructure work only — the actual school building will require a separate planning application in future.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.