DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
Changes to an approved apartment scheme to add 59 new homes by raising four blocks by 1–2 storeys, alongside increased cycle parking and reduced car parking.
The development adds 3 studios, 19 one-bedroom and 37 two-bedroom units. Four blocks will range from 4 to 5 storeys in height. The scheme also tweaks 99 existing permitted units, including minor changes to layouts and one studio replacing a two-bedroom unit.
133 car parking spaces are proposed (129 basement, 4 at surface level)—a reduction from the original 155 spaces. Cycle parking increases significantly to 267 spaces, including 220 long-stay, 45 short-stay and 2 cargo spaces.
A temporary crèche and tenant amenity space are removed. Communal open space increases, with redesigned courtyard areas and new communal refuse storage.
The basement is reconfigured, and surface water drainage and sustainable drainage (SuDS) systems are redesigned. Landscaping and planting are updated.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.