DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The developer is building a new stormwater detention basin (a pond that temporarily holds rainwater) on the school site, along with pipes to drain water into Ticknick stream. An existing temporary pond north of Mercer Link Road will be filled in. The site will be regraded to prepare for the future school building.
The detention basin will manage surface water runoff from the development and reduce flood risk. Hard and soft landscaping, including seating areas and boundary treatments, will be added around the basin. Water will discharge to Ticknick stream via two outfall pipes connected to the existing Beckett Park attenuation system.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.