DZ24A/0585/WEB
RefusedLands within the Townland of Brennanstown, Brennanstown, Dublin 18
Lands within the Townland of Brennanstown, Brennanstown, Dublin 18
An amendment to the existing permitted Druid's Glen development (Phase 01) to add 4 additional homes and reconfigure the mix of housing types across terraced houses, semi-detached houses, and duplex apartments.
The development will increase from 342 to 346 residential units. Changes include: 3 new 2-storey 3-bed terraced houses; replacement of 5 existing houses with 6 new 4-bed terraced houses; and reconfiguration of Block A (a 3-storey building) from 8 mixed units to 8 new 3-bed duplex units. All homes are for private ownership.
Car parking is being reconfigured, with a reduction from 16 to 14 spaces in the permitted surface car park. Cycle and bin storage will be provided alongside the changes.
The amendment is confined to Phase 01 of the permitted development, north of the main Cherrywood distributor road. Maximum building height remains 3 storeys.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.