DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
This is a change to an already-approved Cherrywood development, adding 59 new homes by making four apartment blocks taller (adding 1–2 storeys each). The buildings will now range from 4 to 5 storeys in height.
The 59 new units comprise 3 studios, 19 one-beds and 37 two-beds. Combined with the 99 existing permitted units (with minor layout tweaks), the full development will have 158 homes across four blocks.
Car parking is being reduced from 155 to 133 spaces (mostly basement, with 4 at surface level). Cycle parking is increasing substantially from 175 to 267 spaces, including 220 long-stay, 45 short-stay and 2 cargo spaces. The site adjoins the Luas Green Line.
The development includes updated drainage and SuDS (sustainable drainage) design. Landscaping is being redesigned with new courtyard pavilions, increased communal open space, and changes to planting and boundary treatments.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.