DZ25A/0044/WEB
GrantedIn the Townlands of Laughanstown, and Brennanstown, Dublin 18
In the Townlands of Laughanstown, and Brennanstown, Dublin 18
The development adds one extra storey to two existing buildings, creating 25 additional homes and bringing the total scheme to 517 units. The site covers 3.73 hectares in the Cherrywood Strategic Development Zone, bounded by Barrington's Road, the Green LUAS Line, and Castle Street.
The 25 new units comprise 10 one-bed, 13 two-bed, and 2 three-bed homes. A further 54 permitted units are being altered, including corner balcony design changes and some unit reconfigurations. The development spans multiple buildings with the two tallest gaining an additional storey.
Car parking reduces from 555 to 381 spaces (268 basement, 113 surface level). Bicycle parking increases from 655 to 760 spaces (650 long-stay, 110 short-stay). New level access and stairs with guide rails improve basement cycle parking accessibility. The site connects to the Green LUAS Line to the east.
The development includes below-ground water storage to manage flooding, a revised ventilation strategy, and reconfigured public spaces with streetscaping and public lighting. Bin and bicycle storage facilities are reorganised, with a waste store relocated to ground level.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.