DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
The development adds 59 new homes to an existing permitted residential scheme in Cherrywood, with all four residential blocks increasing in height by one storey (Block D by up to two storeys). The site sits between the Luas green line and Tully Vale Road.
The 59 new units comprise 3 studios, 19 one-bedroom and 37 two-bedroom homes. Combined with existing permitted units (with minor amendments), the total scheme delivers 158 homes across four blocks now ranging from 4 to 5 storeys in height.
133 car parking spaces are now proposed (down from 155 previously), with 4 at surface level and 129 in basement. Bicycle parking increases significantly to 267 spaces (220 long-stay, 45 short-stay, 2 cargo spaces).
The basement car park has been reconfigured and redesigned. Surface water drainage and sustainable urban drainage systems (SuDS) have been updated to reflect the new layout. Communal open space provision increases through redesigned courtyard pavilions and amended landscaping with updated planting and boundary treatments.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.