DZ21A/0713
GrantedLands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin)
Lands (c. 17.01 ha) in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18, (also Co Dublin)
This is a refinement to three existing apartment towers (Blocks A1, A2, and A3) already approved for Cherrywood. The changes improve windows, adjust the building height marginally, and update internal services.
The three blocks remain residential. Windows are larger (increased from 1.2m to 2.4m in height for better light), and 20 apartments across the blocks have revised balcony designs. A small loss of 63 sq.m of shared resident space results from relocating electrical substations to meet utility requirements.
Block A1 increases marginally from 30.06m to 30.13m (roughly 10 storeys); Block A2 from 17.4m to 17.45m; Block A3 from 17.2m to 17.76m (both roughly 6 storeys). Overall floor area rises slightly from 214,706 to 214,765 sq.m.
Ground-floor shop fronts are redesigned to allow clearer signage and better display, and new gates will manage access to internal courtyard areas shared by residents and retail.
Additional solar panels are added to Block A1's roof. Roof terraces are redesigned with new screening and landscaping; Block A3's terrace is reduced from 420 sq.m to 208 sq.m.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.