DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
This is an amendment to an already-approved development in Cherrywood. The developer is adding 59 new apartments by increasing the height of four residential blocks by up to one storey each.
The development will contain 158 apartments total: 3 studios, 20 one-bedroom and 135 two-bedroom units. These are spread across four blocks ranging from 4 to 5 storeys in height. Minor changes have been made to 99 existing units' layouts and private outdoor spaces.
133 car parking spaces are proposed (4 at ground level, 129 in the basement basement), down from 155 previously approved. Bicycle parking increases significantly to 267 spaces (220 long-stay, 45 short-stay, and 2 cargo bikes), reflecting a shift toward sustainable travel.
The basement car park has been redesigned to improve surface-level space. A communal open space has been enlarged, with new pavilion structures to house refuse storage. Landscaping, planting, and boundary treatments have been updated.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.