DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The temporary car park on the Red Zone will be reduced and reorganised to align with new residential development nearby. Around 398 temporary parking spaces will remain in use for a further 5 years, plus bus drop-off and motorcycle parking. Additionally, 226 basement spaces in Blocks F1–F3 will be made available as temporary parking to support the wider Campus development.
The Red Zone layout is being reconfigured to improve access and drainage. A bus set-down area and motorcycle parking are included. The reallocation of basement spaces allows existing car parking infrastructure to serve the development while new permanent facilities are completed.
Surface water arrangements on the Red Zone will be reconfigured as part of the redesign to comply with current standards and support adjacent residential development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.