DZ19A/0255
GrantedCherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .
The development upgrades Cherrywood Business Park with 3 elevated meeting pods, a central canopy structure, landscaping improvements including a sunken garden, and better connections for pedestrians and cyclists throughout the site.
Three single-storey meeting pods (each 28 sq.m, raised 3.5–5.3 metres above ground) with wind turbines and solar panels. A 320 sq.m canopy (7 metres high) will be built centrally between Buildings 2, 3, 4, and 5. Building facades will be altered.
A sunken garden between Buildings 2, 3, 4, and 5 with stairs and a lift will provide shared outdoor space. New stairs connect the Business Park to the linear park. Welfare facilities will be added at basement level.
33 car parking spaces will be removed (9 from basement, 24 from surface level) due to a new vehicle ramp north of Building 3 and circulation changes. The north-east ramp will become cyclist-only. New bicycle stands and shelters will be installed at surface level.
Sustainable drainage systems including bioretention areas and rain gardens will manage surface water. Landscaping improvements cover part of the linear park with new planting, grading, and pedestrian and cycle routes. Viewing areas and fill will be added east of Pond 4.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.