DZ19A/0148
Granted17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
17.01 ha in the townlands of Cherrywood, Laughanstown, Loughlinstown and Glebe, Dublin 18 (also Co. Dublin)
The developer is reconfiguring Blocks C1, C2 and D1 to add 47 additional homes to the town centre development on Grand Parade, Bishop Street and Tully Vale Road. This increases the total from 384 to 431 units.
The 431 units comprise 59 studios, 109 one-beds, 231 two-beds and 32 three-beds. All units will have balconies or terraces. The development is built-to-rent across three blocks in the Cherrywood town centre.
Ground-floor retail space increases to 564 sq.m. Non-retail space (cafés, services) grows to 2,047 sq.m, and resident amenities rise to 1,096 sq.m. A relocated crèche with outdoor play space is included.
431 car parking spaces and 431 bicycle spaces are provided in basement levels, along with 21 motorbike spaces. Access is via Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road.
The scheme includes revised landscaping and a green wall to enhance the streetscape around the town centre blocks.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.