DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The Red Zone temporary car park is being reconfigured and reduced from 740 spaces to 398 spaces to make way for new residential development. Additionally, 226 basement parking spaces in The Campus Blocks F1–F3 will be temporarily made available to serve the wider development.
The temporary surface car park will continue operating for 5 years with reconfigured access, layout, and drainage. New bus set-down and motorcycle parking areas are being added. The basement spaces in The Campus will become available for cumulative temporary parking, allowing the development to function while permanent arrangements are finalised.
The scheme affects two key areas: the Red Zone surface car park (Plot HIE3/BG5) and Blocks F1–F3 basement at The Campus, both within the Cherrywood Strategic Development Zone.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.