DZ22A/0403
RefusedTownlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
Townlands of Laughanstown, Brennanstown and Cherrywood, Dublin 18
This is a refinement to homes already approved in Development Area 8 (Tully). The total number of 168 homes remains unchanged; the applicant is tweaking house designs and roof details to improve the scheme.
12 houses fronting Tully Road are being reclassified to different house types (all types already permitted elsewhere in the Cherrywood scheme). Three apartment blocks (duplex buildings) have roof changes: glazed corridor ceilings are becoming solid, raising parapet height slightly but not overall building height.
The site covers 9.68 hectares, bounded by Castle Street (west), Gun and Drum Hill Road (north), Lehaunstown Lane (south), and Tully Park and future development lands (east).
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.