DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
A new stormwater detention basin (pond) will be built to manage rainwater runoff, with associated pipes carrying water to Ticknick stream. An existing temporary pond north of Mercer Link Road will be filled in, and ground levels will be adjusted to prepare the site for a future school (which will require a separate planning application).
The new pond will help reduce flooding by temporarily holding rainwater during heavy storms before slowly releasing it to Ticknick stream. A second drainage pipe from Beckett Park will also connect to the stream, improving stormwater management across the wider area.
The development covers 0.95 hectares across two Cherrywood development zones (Areas 1 and 8). Landscaping and seating areas will be included around the pond.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.