DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The development includes a new attenuation pond (a basin that temporarily stores rainwater to prevent flooding), infilling of an existing temporary pond north of Mercer Link Road, and a new stormwater pipe connecting Beckett Park to Ticknick stream. The site will be regraded to prepare for future school development.
The attenuation pond and outfall system will manage surface water runoff and reduce flood risk by directing stormwater to Ticknick stream. Landscaping and seating areas will be added around the pond, with boundary treatments to define the space.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.