DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The development creates a new rainwater detention basin (pond) and stormwater pipes to drain excess water into Ticknick stream, preparing the site for a future school. The existing temporary pond will be filled in and the ground regraded.
A detention basin will hold rainwater during heavy rain and slowly release it into Ticknick stream, reducing flood risk downstream. Soft landscaping, seating, and boundary treatments are included. The scheme manages stormwater runoff from both this site and Beckett Park.
The site covers 0.95 hectares across Development Areas 1 and 8 of Cherrywood. This is infrastructure-only; the actual school building will require a separate planning application.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.