DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The site will be prepared for a future school by installing a rainwater detention basin (a pond that holds stormwater during heavy rain) and new drainage pipes that connect to Ticknick stream. The existing temporary pond will be filled in, and ground levels will be regraded to prepare the land.
A new detention basin will manage stormwater runoff from the site and Beckett Park. This reduces flood risk by holding rainwater during storms before it slowly releases into Ticknick stream. The site will include landscaping and soft ground features.
The development includes new stormwater outfall pipes connecting to Ticknick stream to manage drainage for the site and surrounding areas.