DZ18A/1129
GrantedSite (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
Site (c.0.95ha) at Laughanstown & Brennanstown, Dublin 18 (Development Areas 1 & 8)
The development involves building a new detention basin (a pond that temporarily holds rainwater during heavy storms) and connecting it to Ticknick stream via an outfall pipe. An existing temporary pond north of Mercer Link Road will be filled in. The site will be regraded to prepare for a future school building, which will require a separate planning application.
The detention basin manages stormwater runoff, reducing flood risk downstream. Two stormwater systems — from the new basin and Beckett Park — will connect to Ticknick stream. The site will include landscaping, seating areas, and boundary treatments to integrate the pond into the neighbourhood.
The site covers 0.95 hectares across Development Areas 1 and 8 of Cherrywood. Site levels will be regraded to accommodate future development.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.