Reconfiguration of three residential blocks (C1, C2, D1) in Cherrywood town centre to accommodate 47 additional homes, bringing the total from 384 to 431 units.
The development will comprise 59 studios, 109 one-bed units, 231 two-bed units, and 32 three-bed units. All units will have balconies or terraces. The residential floor area increases from 35,290 to 35,787 sq.m across the three blocks fronting Grand Parade, Bishop Street, Tully Vale Road and Wyattville Link Road.
Retail space increases to 564 sq.m. Non-retail services grow to 2,047 sq.m. The crèche expands with an outdoor play area, and resident amenities increase to 1,096 sq.m.
431 car parking spaces in reconfigured basements, plus 431 bicycle spaces, 21 motorbike spaces, and storage facilities for residents.
Revised landscaping treatment and green wall provision across the site. Four substations relocated and one new substation added to support the increased density.