DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The temporary Red Zone car park will be reduced from 740 spaces to 398 spaces, with the layout reconfigured to match new residential development nearby. Additionally, 226 basement parking spaces in Blocks F1–F3 will be reallocated as temporary car parking to serve the wider Campus area. The temporary car park permit will be extended for a further 5 years.
The reconfigured temporary car park will include bus set-down areas and motorcycle parking. Access arrangements and surface water drainage will be reorganised to work with the permitted residential development on the adjacent plot.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.