DZ24A/1007/WEB
Granted‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
‘Red Zone’ temporary surface car park, and Blocks F1-F3, ‘The Campus’, Cherrywood Avenue,, Cherrywood (Glebe Townland), Co. Dublin, Dublin 18
The Red Zone temporary car park will be reduced and reconfigured to work with a new residential development on an adjoining plot. Up to 398 parking spaces will remain in temporary use for a further 5 years. Additionally, 226 existing spaces in the basement car park of Blocks F1–F3 at the Campus will be made available as temporary parking, subject to changes to existing planning conditions.
The temporary surface car park will be reorganised with improved access and drainage to align with the adjacent residential scheme. The layout will include bus set-down and motorcycle parking areas. Basement spaces in the Campus blocks, previously held in reserve, can now be brought into use as temporary car parking.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.