DZ20A/0585
Refusedon a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
on a site in the Townlands of Laughanstown and Cherrywood, Dublin 18
A temporary marketing suite for the Cherrywood Village Centre development, comprising 3 buildings arranged around a landscaped courtyard. The consent is for 4 years and 11 months.
2 single-storey and 1 two-storey building, with a 3.5–3.7 metre high boundary or covered walkway linking them. Total floor area: 304 sq.m.
8 car parking spaces via a new vehicular access from Gun and Drum Hill Road. Access to the wider Cherrywood development via existing and permitted roads connecting to Valley Drive and Wyatville Link Road.
Marketing suite to promote the Cherrywood Village Centre scheme. A marketing sign (1.27 sq.m) on the entrance elevation.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.