DZ21A/1017
GrantedTownlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin)
Townlands of Laughanstown, Glebe, and Cherrywood, Dublin 18, (also Co Dublin)
The development delivers 1.6 kilometres of roads and infrastructure (mostly new) to support the wider Cherrywood Strategic Development Zone. This includes an underpass beneath the Wyattville Link Road, a greenway, and a pocket park around two ancient monuments.
The site protects two legally protected historic structures: a Wedge Tomb (a prehistoric burial chamber) and a Cairn (an ancient stone mound). A 0.7-hectare park will be built around them with landscaping and retaining walls.
New footpaths, pedestrian crossing points, and cycle lanes will connect the site. Beckett Road will include a 42-metre underpass under the Wyattville Link Road. The temporary diversion of 0.3 km of the Wyattville Link Road is required during construction.
Surface water drainage infrastructure includes a temporary attenuation tank and connection to the wider SDZ drainage network. Hard and soft landscaping, screen fencing, and public lighting are proposed throughout.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.