DZ24A/1030/WEB
GrantedIn the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
In the Townlands of Laughanstown and Cherrywood, Cherrywood, Dublin 18
This is an amendment to an already-approved development, adding 59 new homes by increasing the height of the four residential blocks by one storey each (with Block D getting a partial two-storey increase).
The 59 new units comprise 3 studios, 19 one-bedroom and 37 two-bedroom homes. Combined with the 99 existing permitted units, the development will have 158 homes across four blocks ranging from 4 to 5 storeys. Minor changes are being made to some of the already-approved units' layouts and private outdoor spaces.
Car parking reduces from 155 to 133 spaces (with 4 at ground level and 129 underground). Bicycle parking increases significantly from 175 to 267 spaces, including 220 long-stay, 45 short-stay and 2 cargo spaces.
The site's drainage and sustainable water management (SuDS) design is being adjusted to accommodate the reconfigured basement. Landscaping is being redesigned, including increased open space for residents and changes to planting and boundaries.
Summary generated by AI from the official planning description. Always refer to the original documents for authoritative details.